Dolna Odra
Welding and assembly at the construction site of two gas-steam units at the Dolna Odra Power Plant
Huta Miedzi Głogów
Welding and assembly at the construction site of the New Oxygen Plant (implementation 04/2022 – 10/2022)
Air Liquide Global Głogów
Welding at the construction site of the new Air Distribution Unit “ASU KGHM 2” in Głogów (implementation 06/2022 – 11/2022)
Tłocznia Gazu Goleniów
Welding services for the expansion of the existing gas compressor station in Goleniów (implementation 08/2021 – 05/2022)
Tłocznia Gazu Odolanów
Prefabrication and expansion of the gas compressor station in Odolanów – welding services (implementation 10/2021 – 03/2022)
Płoty – Goleniów
Welding on the Płoty – Goleniów section of the gas pipeline; project in cooperation with ADK (implementation 10/2021 – 03/2022)
Tłocznia gazu Klepaczew, Goleniów i Hołowczyce
Welding services (implementation 07/2021 – 12/2021)
Huta Miedzi Głogów
Welding services in the production of power boilers, welding of P91 and P92 steel and Inconel
Rutenberg Power Plant
Prefabrication for the project – welding services (implementation 08/2021 – 11/2022)
E-Piim Dairy Plan
Prefabrication of stainless steel installations
– welding services
– NDT supervision (implementation 07/2021 – ongoing)
Elektrociepłownia Siechnice
Welding and assembly services and quality control services during the construction of a gas-steam combined heat and power plant for the Wrocław Combined Heat and Power Plant KOGENERACJA S.A. in Siechnice
Zakłady Azotowe Kędzierzyn
Welding and assembly services in the construction of a peak and reserve boiler room for natural gas with a capacity of 150 Mg/h of steam at Grupa Azoty Zakłady Azotowe Kędzierzyn S.A.
Termianal gazowy w Świnoujściu
Welding and assembly services, supervision services, engineering services for the expansion of the onshore part of the liquefied natural gas regasification terminal in Świnoujście.